Sunday, August 15, 2010
Groundwork and Foundations
The masons put the framing in, Brian and Jordan plumbed her up, we battled a surly plumbing inspector, BLP reinstalled power, Brian and I laid the pex tubing, septic tanks and fields were set, and we passed all (septic, plumbing, electrical, mechanical) intermediate inspections. Good stuff.
Next up: the concrete was poured for the basement slab (just need to post photos), block walls going up this week, update on the well (should be finished Tuesday?).
Next up: the concrete was poured for the basement slab (just need to post photos), block walls going up this week, update on the well (should be finished Tuesday?).